When it comes to fall rescue, speed is of the essence. Describes policies and procedures for continued implementation of an OSHA National Emphasis Program (NEP) to identify and to reduce hazards which are causing or likely to cause serious injuries and fatalities during trenching and excavation operations. Cave-in: the movement of soil or rock into an excavation, or the loss of soil from under a trench shield or support system, in amounts large enough to trap, bury, or injure and immobilize a person. Occupational Safety and Health Administration, Outreach Training Program (10- and 30-hour Cards), OSHA Training Institute Education Centers, Severe Storm and Flood Recovery Assistance. <br><br>Special skills which i have adopted over the years includes emergency preparedness, performing of high angle rope rescue , confined space rescue as well as . the On-Site Incident Commander duties. Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. I hope to learn a lot from the team in . Representative permit spaces must, with respect to opening size, configuration, and accessibility, simulate the types of permit spaces from which rescue is to be performed. 1926.651 (k) (1) "H EKzbdcl hYph06r99 grK;MT 00#P?=?K;u+[z_KY 9Z3 "it|~M&R9>C7QM,{u
$^s0-&k.85V(EB{"3o} Kickout: the accidental movement or failure of a cross brace. 0000006418 00000 n
Design and construction of guard rails . This log shall include the date, work site location, results of the inspection, and a summary of any action taken to correct existing hazards. If water is controlled or prevented from accumulating by the use of water removal equipment, the water removal equipment and operations shall be monitored by a competent person to ensure proper operation. 0000012443 00000 n
The following information is marked on evacuation maps: Emergency exits Primary and secondary evacuation routes Locations of fire extinguishers Fire alarm pull stations' location a. Fatalities caused by falls continue to be a leading cause of death for construction employees. Training and Duties of Program Manager
The Program Manager, Responsible Person, shall receive the training detailed in this program as well as training on the requirements detailed in the OSHA Excavation Standard. Sidewalks, pavements, and appurtenant structure shall not be undermined unless a support system or another method of protection is provided to protect employees from the possible collapse of such structures. OSHA requires that fall protection be provided at elevations (with unprotected edges) of four feet in general industry workplaces, five feet in shipyards, six feet in the construction industry, and eight feet in long shoring operations. When excavation operations approach the estimated location of underground installations, the exact location of the installations shall be determined by safe and acceptable means. Allied Insurance will help protect your construction company with liability and risk insurance. Inspection by Program Manager
The Program Manager, Responsible Person , shall conduct daily inspections of excavations, adjacent areas, and protective systems for evidence of a situation that could result in possible cave-ins, failure of protective systems, hazardous atmospheres, or other hazardous conditions. Trench: a narrow excavation (in relation to its height) made below the surface of the ground. Theloss of circulation can lead to nausea, adrop inblood pressure, loss of consciousness and the onset of circulatory shock. Whether you're new to the world of safety gloves or an experienced pro, this guide has something for everyone. Head protection should be worn. 9 Jn\Wg&@N=2l[H!S+ 8L^b(6rt}:+[eLGdF8Ol]iTw^hc59X/68K#yzad&H%'*,7J:jCXbE65p;,"ipvxgjd$}Buj%Zz']eYVF4wi9pUm&_i?YNQ!NDcCP"
fH9~&h0\IVSTT+uvDKM\D1hkn$lvrq%WjO'=UQaU P;h1L6n'%R|4176O{UD <>
Protecting Your Business Apart from an emergency response plan, you should secure your business against uncertainty. Ensure that affected employees practice making permit space rescues before attempting an actual rescue, and at least once every 12 months, by means of simulated rescue operations in which they remove dummies, manikins, or actual persons from the actual permit spaces or from representative permit spaces, except practice rescue is not required where the affected employees properly performed a rescue operation during the last 12 months in the same permit space the authorized entrant will enter, or in a similar permit space. "The employer shall provide for prompt rescue of employees in the event of a fall or shall assure that employees are able to rescue themselves." When you whittle down this rule, the core of the meaning is that employers need to provide some form of rescue if a fall occurs. Ladders placed in any location where they can be displaced by workplace activities or traffic shall be secured, or barricades shall be used to keep these activities away from the ladders. Experience interfacing with teams across all phases of . 4 0 obj
Activating the Excavation Emergency Rescue Plan and Emergency Response Team (i.e. Each atmospheric testing instrument shall be calibrated by Responsible Person on a schedule and in the manner recommended by the manufacturer. All surface encumbrances that are located so as to create a hazard to employees shall be removed or supported, as necessary, to safeguard employees. Employees shall be protected from excavated materials, equipment, or other materials that could pose a hazard by falling or rolling into excavations. Company Name has appointed one or more individuals within the company to assure compliance with the requirements of this program. Adequate precaution shall be taken such as providing ventilation, to prevent employee exposure to an atmosphere containing a concentration of a flammable gas in excess of 20 percent of the lower flammable limit of the gas. If excavation work interrupts the natural drainage of surface water (such as streams), diversion ditches, dikes, or other suitable means shall be used to prevent surface water from entering the excavation and to provide adequate drainage of the area adjacent to the excavation. Cross braces: the horizontal members of a shoring system installed from side to side of the excavation. Where review or approval of a support system by a registered professional engineer is required, Responsible Person shall secure this review and approval in writing before the work begins. It really depends on the type of excavation, which is why we need to be careful about how prescriptive this rule is to be. There are 29 OSHA-approved State Plans operating state-wide occupational safety and health programs. 0000238670 00000 n
> [ bjbj % j j l N N N N N N N b 2 2 2 8 :2 V2 b H 3 3 " @3 @3 @3 @3 @3 @3 H H H H H H H $ FI fK l 5H N @3 @3 @3 @3 @3 5H 4 N N @3 @3 JH 4 4 4 @3 F N @3 N @3 H 4 @3 H 4 4 ; G N N H @3 3 gq#b / 2 3 G H `H 0 H G K 4 K H 4 b b N N N N
Sample Written Program
for
Excavation Safety
provided as a public service by
OSHCON
Occupational Safety and Health Consultation Program
Texas Department of Insurance, Division of Workers Compensation
Publication No. ?e|o Additional Requirements
Excavation of material to a level no greater than two (2) feet below the bottom of the members of a support system is allowed, but only if the system is designed to resist the forces calculated for the full depth of the trench. 0000066930 00000 n
If a worker is not injured after a fall, self- rescue through devices with descent capability may be the best option. SBzxCSzs4:EAy 06U )9QAHkq183.fq f8\@d.,h
! A registered professional engineer has approved the determination that such excavation work will not pose a hazard to employees. Stability of Adjacent Structures
Responsible Person will determine if the excavation work could affect the stability of adjoining buildings, walls, sidewalks, or other structures. Fall protection plan . All temporary excavations of this type shall be backfilled as soon as possible. The device used for atmospheric monitoring shall be equipped with an audible and visual alarm. Protection from Water Accumulation Hazards
Employees are not permitted to work in excavations that contain or are accumulating water unless precautions have been taken to protect them from the hazards posed by water accumulation. At least one written copy of the tabulated data, which identifies the registered professional engineer who approved the data, shall be maintained at the jobsite during construction of the protective system. Structural ramps used for access or egress of equipment shall be designed by a person qualified in structural design, and shall be constructed in accordance with the design. Employees shall be protected from the hazard of cave-ins when entering or exiting the areas protected by shields. When controls are used that are intended to reduce the level of atmospheric contaminants to acceptable levels, testing shall be conducted as often as necessary to ensure that the atmosphere remains safe. If excavation work interrupts the natural drainage of surface water (such as streams), diversion ditches, dikes, or other suitable means shall be used to prevent surface water from entering the excavation. There shall be no indications of a possible loss of soil from behind or below the bottom of the shield system while the trench is open. Structural ramps that are used solely by employees as a means of access or egress from excavations shall be designed by a competent person. For the purpose of emergency response, an excavation shall be defined by any depression, hole, trench, or earth wall, man made or natural, of four feet or . Procedures to be followed if a hazardous atmosphere exists or could reasonably be expected to develop during work in an excavation. OSHA mandates that an employer provide for prompt rescue of employees or ensure that employees are able to rescue themselves. OSHA 1910.132 requires that a hazard assessment be completed prior to the job, and derive a plan that includes the selection of the proper protective and rescue equipment that is deemed necessary to Design of Sloping and Benching Systems
The slope and configuration of sloping and benching systems shall be selected and constructed by Responsible Person in accordance with the following options:
Allowable configurations and slopes
Excavations shall be sloped at an angle no steeper than one and one-half (1 ) horizontal to one (1) vertical (34 degrees measured from the horizontal), unless one of the options listed below is used. Ensure the plan is part of the overall site safety plan. Shield It, National Emphasis Program on Trenching and Excavation, Severe Storm and Flood Recovery Assistance. Step 1 - Don't Panic, try to remain cool. Provide the rescue team or service selected with access to all permit spaces from which rescue may be necessary so that the rescue team or service can develop appropriate rescue plans and practice rescue operations. 0000027415 00000 n
Excavation Safety Plan Objective The objective of this excavation safety plan is to protect employees from safety hazards when working with excavations and to comply with the Occupational Safety and Health Administration (OSHA) regulations. Emergency rescue equipment is required to be readily available where a competent person determines, based on the conditions at each job site, that hazardous atmospheric conditions exist or may reasonably be expected to develop during work in an excavation. Excavation: any man-made cut, cavity, trench, or depression in an earth surface formed by earth removal. Uprights placed so that individual members are closely spaced, in contact with or interconnected to each other, are often called sheeting. OSHA requires employers to develop a permitting system for allowing workers into confined spaces. OSHA Regulations Standard 29 CFR 1926 Subpart P regulates excavations for general industry and the rescue service and shall be considered the basis for emergency trench rescue operations. Bell-bottom pier hole: a type of shaft or footing excavation, the bottom of which is made larger than the cross section above to form a bell shape. 1669 . According to OSHA 1926.502 (d)20: "The employer shall provide for prompt rescue of employees in the event of a fall or shall assure that employees are able to rescue themselves." An FRP is required for all contractors working at height on the project when a fall arrest system is being used. There shall be no indications of a possible loss of soil from behind or below the bottom of the support system while the trench is open. Confined space entry is commonplace on construction, mining, oil and gas and . Employees exposed to flying fragments, dust or other materials produced by drilling, sawing, sanding, grinding, and similar operations shall wear approved safety glasses with side shields. Occupational Safety & Health Administration, Occupational Safety and Health Administration, Outreach Training Program (10- and 30-hour Cards), OSHA Training Institute Education Centers, Design and Construction Requirements for Exit Routes, Maintenance, Safeguards, and Operational Features for Exit Routes, Severe Storm and Flood Recovery Assistance, Evacuation Plans and Procedures : Emergency Action Plan. The precautions necessary to protect employees adequately vary with each situation, but could include special support or shield systems to protect from cave-ins, water removal to control the level of accumulating water, or use of a safety harness and lifeline. endobj
Drafting an emergency action plan (EAP) is not enough to ensure the safety of your employees. Design by a registered professional engineer
Support systems, shield systems, and other protective systems designed in a manner other than the preceding three options shall be approved by a registered professional engineer. 0000003853 00000 n
An employer who designates rescue and emergency services, pursuant to 1926.1204(i), must: Evaluate a prospective rescuer's ability to respond to a rescue summons in a timely manner, considering the hazard(s) identified; Evaluate a prospective rescue service's ability, in terms of proficiency with rescue-related tasks and equipment, to function appropriately while rescuing entrants from the particular permit space or types of permit spaces identified; Select a rescue team or service from those evaluated that: Has the capability to reach the victim(s) within a time frame that is appropriate for the permit space hazard(s) identified; Is equipped for, and proficient in, performing the needed rescue services; Agrees to notify the employer immediately in the event that the rescue service becomes unavailable; Inform each rescue team or service of the hazards they may confront when called on to perform rescue at the site; and. 0000015503 00000 n
trailer
<]/Prev 577059>>
startxref
0
%%EOF
427 0 obj
<>stream
Manufactured materials and equipment used for protective systems shall be used and maintained in accordance with the recommendations of the manufacturer, and in a manner that will prevent employee exposure to hazards. An employer will need to add information relevant to their particular facility in order to develop an effective, comprehensive program. GLOSSARY
Accepted engineering practices: the standards of practice required by a registered professional engineer. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees. The warning system shall consist of barricades, hand or mechanical signals, or stop logs. Workers must use both hands when climbing up or down ladders. | ##
;e#[9,O=HknYpQp! of the excavation), the excavation is also considered to be a trench. Aluminum hydraulic shoring: a manufactured shoring system consisting of aluminum hydraulic cylinders (crossbraces) used with vertical rails (uprights) or horizontal rails (wales). Shore It. Benching system: a method of protecting employees from cave-ins by excavating the sides of an excavation to form one or more horizontal steps, usually with vertical or near-vertical surfaces between levels. A Fall Protection Plan must be developed and evaluated on a site by site basis. Cal/OSHA Regulation Guidance Materials, Posters, and Other Resources Additional Resources User's Guide to Cal/OSHA Cal/OSHA Consultation Services or Toll-free Number 1-800-963-9424. Excavation shall be done in a manner that does not endanger the underground installations or the employees engaged in the work. 0000028124 00000 n
Utility companies or owners shall be contacted within established or customary local response times, advised of the proposed work, and asked to establish the location of the utility underground installations prior to the start of actual excavation. A poorly prepared plan, likely will lead to a disorganized evacuation or emergency response, resulting in confusion, injury, and property damage. Tabulated data: tables and charts approved by a registered professional engineer and used to design and construct a protective system. Employees are not permitted to carry any object or load while on a ladder that could cause them to lose their balance and fall. Provide atmospheric testing and equipment selection as needed. Employees entering bell-bottom pier holes or other similar deep and confined footing excavations shall wear a harness with a lifeline securely attached to it. 0000001356 00000 n
Where workers in the excavation may pass under these walkways or bridges, a standard guardrail and toeboard shall be used to prevent the hazard of falling objects. 0000071504 00000 n
What are OSHA Excavation Standards? Excavation safety training and procedures prevent serious injuries and accidents. I am about to start a new chapter in my professional life! EVACUATION ROUTES Evacuation route maps have been posted in each work area. 0000004998 00000 n