Figure 33: Weather proof sticker for lighting pole numbering reference Error! Biomed staff of KPJ Johor are very friendlyand generous for sharing a lot of knowledge to me. at . 2 . I had attend to the maintenance department and in charge by Ms Athirah and Ms Aina who is the biomed staff at the KPJ JOHOR. examination. working environment while also providing benefits in terms of personal and professional GUIDELINES. b) Planting teamwork and good relations between workers and employees of an organization. Vital sign fuse blow. You need to include certain ingredients to make them succeed. 2.1 Nature of Activities Carried Out During the Training Programme. Sorry, preview is currently unavailable. The training paved way for students to develop various skills and potential and enhance productivity by adding to services provided by the organization. Figure 3.5.2 PPM of shockwave therapy machine.WEEK 6 ( 12 APRIL 2021 17 APRIL 2021)Corective maintenance of syringe pump B. Braun, the plug adapter are faulty and thesyringe stand holder screw are loose. Experience: Over 30 years of exceptionally diverse . MAINTENCE SER null. Blessings and Peace be upon the Prophet Muhammad S.A.W, hisentire family, and his companions. SUMMER TRAINING REPORT 1) Turn ON the VS4 using AC charge or battery power. Tap here to review the details. Thereare 18 KWAN clinics and 1 Hospital Waqaf An-Nur (HWAN) in Malaysia today, aswell as five mobile clinics in Kuala Lumpur, Johor, Selangor, and Kelantan.Our efforts have enabled more than one million patients since the inception of the firstclinic in Johor in 1998.2.1.6 LOCATIONKPJ Johor Specialist Hospital Figure 2.1.6.1 KPJ Johor Specialist Hospital Main EntranceJohor Specialist Hospital opened its doors to the public in May 1981, as the first privatehospital in Johor. En Firzi as the Biomed Engineer had give the explanation about the Biomedical Trainee Manual to me. If an opportunity given I will utilize my skills and knowledge at the best of my ability. 1 MPSPK General Objectives and Functions . I also have update the calibration date and seriel number of equipment had do calibration in BEMS folder. Ensure that AC outlet is properly grounded andsupplies the specified voltage and frequency (100-240VAC, 50-60 Hz). SUMMER TRAINING REPORT S. Training report on 33/11 kV substation CVT measures voltage and steeps down at 110V. Vendor had do EST test to the tympanometer and had do the performancetest to the tympanometer. Figure 3.2.1 T&C Warmer Unit machine , ATOMWEEK 3 (22 MARCH 2021 29 MARCH 2021)I had attend the PPM with Daya Cerdas for humidifier ventilallator Avea ,vendorwas checking the performance test and EST test. Malaysian Engineering Accreditation Council (EAC) has stated that an undergraduate has Benefits EST to IEC/EN62353, AAMI/IEC/EN 60601-1 & more, built-in electronic data storage, flexible user-definable test routines, battery-powered leakage, insulation & earth/ground bond tests, 50/100/250/500V DC insulation testing, automatic secondary verification ensures the correct result first time, small & compact with direct printing via bluetooth connectivity, available in a wide range of power configurations, compatible with Med-eBase for simple asset management. Training report on nwr carriage workshop, jodhpur, Final Report For Summer Training - Naif AlJuhani, Colombo Dockyard PLC Industrial Training Report, SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING), DESIGN OF BUCKET ELEVATOR WITH AUTO BELT TENSIONER UNIT. The value of respect for those around him will arise within the student if the students Industrial Training heartfelt and sincere. A good project report presents your final year project work in brief and very effective. - Currently working as a Co-op student with Hydrogen Optimized in Electrical Engineering Team in making the manufacturing systems fully automated with the help of Programable Logic Controllers and Human Machine Interface. 264.2.1.3 Rigel 288+ Electrical Safety Analyzer Figure 4.2.1.3 Rigel 288 Electrical Safety Analyzer The Rigel 288+ electrical safety analyzer offers an accurate and fast solution for meeting international and local safety standards are using standard AA batteries, tests can be carried out for insulation, earth/ground bond testing, and touch or point-to-point leakage current testing. Currently pursuing Scrum and Agile Management.<br>Finished PMP and ITIL4 Foundation Certification.Skilled in Configuration Management, Requirements Analysis, Troubleshooting, Networking. Disconnect the probe and remove it from the well. many other aspects of town growth and well-being in Sungai Petani and Kuala Muda. Biochemistry. Morerver, I had dothe payment certificate for PPM with my supervisor for medical equipment at KPJJohor. COMPANY CLASSIFICATION (SIZE): SME, Large Enterprise, etc, No of employees Green/Yellow The industrial watertube boiler typically produces steam or hot water primarily for industrial process applications, and is used less frequently for heating applications. I had learned how the cycle of Biomedical Engineering life cycle. allocate under electrical division. With the Industrial Training many useful and valuable experience gained as supply before set foot in the sphere of employment. 2) Press ON the standby button 3) Press the NIBP button to get the NIBP measurements. 37CHAPTER 5 FINDINGS AND RECOMMENDATIONS5.1 FINDINGS Alhamdulillah, Praise to Allah for giving me this opportunity to gainknowledge and experience as a biomed technician at KPJ Johor Specialist Hospital. by new chairman for every 2 years, Implement small projects of the council through quotation, Resolve public complaints related to roads, drainage and others departmentally, Install tent equipment for governmental official functions, Assist other agencies related to natural disasters, Monitor the tender special projects provided by the ministry of housing and local About us. Exposure that was given to me at this firm can provide the picture on a real-life situation,the task and responsibility that would be carried by some people on the field. After that, I meet with En . . Figure 3.12.1 Fuse changing of VS4 monitor.I had took swab test on 27hb May 2021 because feeling unwell, so this is one of actionduring pandemic Covid-19 to avoid from spread the virus to others comitee at the KPJJohor Specialist Hospital. All breakdown and PPM had handling by KPJ biomedstaff during this Movement Control Order (MCO). I always believe in hard work, determination, and courage through any opportunity that is given in order to earn success. A REPORT OF SIX MONTHS INDUSTRIAL TRAINING (14 PT.) En Firzi and EnSalleh had do the site visit for the Linac replacement. 11.2 OBJECTIVE OF INDUSTRY TRAINING Industry training is a major component of the extra-curricular learning in polytechnics. Aided, AICTE NBA Accredited. Specifically, Planned Maintenance isa scheduled service visit carried out by a competent and suitable agent, to ensure thatan item of equipment is operating correctly and to therefore avoid any unscheduledbreakdown and downtime. 254.2.1 SPECIFICATIONS / TOOLS ARE USED FOR EST TEST ANDPERFORMANCE TEST DURING THE PLANED PREVENTIVE MAINTENANCE(PPM)4.2.1.1 ESA 620 FLUKE Figure 4.2.1.1 ESA 620 FLUKEThe ESA620 Electrical Safety Analyzer represents quality excellence in manualpreventive maintenance for the biomedical technician and clinical engineer thatperform tests on medical equipment. To ensure the utilization of buildings are according to the stated conditions. Has a responsibility to settle all financial cost and expenses incurred and due orupon demand. Electrical Engineering SIWES Report. administrative works, and humanitarian aid services. Student also need to apply curiosity throughoutinternship to gain knowledge during the internship. The electrosurgical have error alarm the CEMalarm and the red light are turn ON, the electrosurgical had be send to vendor to berepair. I had change the weightscale battery . Shall so conduct himself/herself so as not to interfere with the wellbeing of otherpatients or providers of healthcare of facilities.6. west university, pdf engineering industrial training report at telekom, cu department of electrical amp electronics engineering, electrical engineer resume genius, internship report requirements electrical and computer, industrial training in ee amp t school of electrical, internship report universiteit twente Powered by TCPDF (www.tcpdf.org) 5 / 5 I am passionate about engineering, research, entrepreneurship and using my skills to solve challenges faced on the African continent. Figure 43: Close-up of Nikkon LED light fittings . 37. It not only builds confidence but also helps in taking up complicated projects easily. Hi, I'm Samuel! ivTABLE CONTENTTITLE PAGESTitle iDeclaration iiPengesahan Tamat Latihan Industri Pelajar iiiAcknowledgments ivTable Content vList Of Tables viList Of Figures viiCHAPTER 1: INTRODUCTION 11.1 Introduction Industry Training 21.2 Objective of Industry Training 31.3 Importance of Industry TrainingCHAPTER 2: BACKGROUND OF INDUSTRIAL TRAINING PLACE 42.1 Introduction 4 5 2.1.1 Profile Company 6 2.1.2 Vision, Mission, Core Values 7 2.1.3 Patients Right & Responsibility 8 2.1.4 KPJ Johor Emblem 8-9 2.1.5 Brand Signature 10 2.1.6 Location 112.2 Organization Chart 112.3 Organization Information 12 2.3.1 Biomedical Organization Structure 122.4 Department Function 13 2.4.1 Head of Services 14 2.4.2 Unit Manager 2.4.3 Medical OfficerCHAPTER 3: SUMMARY OF IDUSTRIAL TRAINING ACTIVITIES 153.1 Introduction 16-243.2 Summary of Industrial Training ActivitiesCHAPTER 4: TECHNICAL SYSTEM 254.1 Introduction 254.2 Planned Preventive Maintenance (PPM) 26-28 26 4.2.1 Specifications Tools for PPM and EST Test 26 4.2.1.1 ESA 620 FLUKE 27 4.2.1.2 ESA 615 FLUKE 27 4.2.1.3 Rigel 2888+ Electrical Safety Analyzer 28 4.2.1.4 ProSim 4 Vital Sign and ECG Simulator 28 4.2.1.5 ProSim 8 Vital Sign and ECG Simulator 29 4.2.1.6 ProSim SPOTLiGHT SPO2 Pulse Oximeter Analyzer 29 294.3 Unplanned Maintenance4.4 Emergency Breakdown 4.4.1 Breakdown Tools Kit vTITLE PAGES4.5 Beyond Economic Repair (BER) 294.6 Testing and Commissioning (T&C) 304.7 Operation of Vital Sign 4 Monitor 30 30 4.7.1 Introduction 31-32 4.7.2 Label of Function 33 4.7.3 Procedure of Vital Sign 4 34 4.7.4 Common Problem of Vital Sign 4 35-36 4.7.5 Planned Preventive Maintenance (PPM) Vital Sign 37 4.7.6 Breakdown Vital Sign 4 38CHAPTER 5: RECOMMENDATIONS AND IMPROVEMENTS 395.1 Findings5.2 Recommendations 40CHAPTER 6: CONCLUSION 416.1 Conclusion 42REFERENCES 43 44APPENDIX 1: PPM RESULT OF GASTROSCOPY 45APPENDIX 2: T&C DOCUMENTS 46APPENDIX 3: MAINTENANCE REQUEST FORM 47APPENDIX 4: WORK PASS APPLICATION FORM 48APPENDIX 5: REQUISITION FORM FOR SERVICE/REPAIRAPPENDIX 6: WORKPLACE MANAGEMENT SYSTEMAPPENDIX 7: ACTIVITIESviLIST OF TABLESTABLE PAGESOrganization chart 10Biomedical organization structure 11Head of Services 12Unit Manager 13Medical Officer 14Label of function of SureSign VS4 Monitor 31-32 viiLIST OF FIGURESFIGURE PAGES2.1.1 KPJ Johor Specialist Hospital Building 52.1.4 Logo KPJ Johor 82.1.6.1 KPJ Johor Specialist Hospital Main Entrance 92.1.6.2 KPJ Johor Maps 103.1 KPJ Johor Outpatients Building 163.1.1 Cot side rail patients bed LKL 173.2.1 T&C warmer unit machine, ATOM 183.3.1 PPM of humidifier Ventilator AVEA using Rigel analyzer 183.4.1 ECG waveform not stable and ECG simulator to calibration 193.5.1 PPM of Laser Therapy machine 193.5.2 PPM of Shockwave therapy machine 203.7.1 Oxygen sensor of GA machine 203.9.1 PPM of Tympanometer 213.10.1 Change the side connecter of warner unit 213.12.1 Fuse changing of VSU monitor 223.14.1 EPOC machine 233.15.1 Voltage Stabilizer problem 233.16.1 Site visit of Linac replacement 244.2.1.1 ESA 620 FLUKE 264.2.1.2 ESA 615 FLUKE 264.2.1.3 Rigel 288+ Electrical Safety Analyzer 274.2.1.4 ProSim 4 Vital Sign and ECG Simulator 274.2.1.5 ProSim 8 Vital Sign and ECG Simulator 284.2.1.6 ProSim SPOTLight Spo2 Pulse Oximeter 284.4.1 Breakdown tools 294.7.1 SureSign VS 4 monitor 304.7.3 Basic Operations of SureSign VS4 monitor 33 viiiCHAPTER 1 INTRODUCTION1.1 INTRODUCTION OF INDUSTRY TRAININGThe industrial training compulsory for every student Diploma in ElectronicEngineering (Medical) as a condition for the award of the diploma. Right to a health and safe environment.Patient's Responsibility1. As a student we also do not have to give up if faced with the difficultiesand always believe that there is various way of solutions to overcome all problems.