MUST BE AN UNRESTRICTED PARKING LANE. APPLICANT INFORMATION (JOINT VENTURE), 1D. West PARKING OF NON-COMMERCIAL VEHICLES ON THE STREET (ROADWAY AND SIDEWALK) WITHIN WORK ZONES IS PROHIBITED. Bureau of Permit Management and Construction Control Suspension of Application Review NYC DOT may suspend the review of applications for permits pending: Refusal to Issue Permit NYC DOT may refuse to issue a permit to an applicant: Voiding and Reissuing of Permits. Insurance and Permit Bonds After initial registration, active permittees must submit proof of all insurance and bonds annually. HIQA inspects work sites for compliance with Title 19 of the NYC Administrative Code, NYC DOT Rules and Regulations, NYC DOT specifications and NYC DOT permit stipulations. MAINTAIN 8 FOOT CLEAR PEDESTRIAN WALKWAY ON SIDEWALK. FIXED SIGN MUST BE REMOVED UPON COMPLETION OF THE APPROVED CLOSURE. OCCUPY A MAXIMUM OF 12 FT OF ROADWAY FOR ASBESTOS REMOVAL ONLY BETWEEN THE HOURS OF 7PM - 6AM, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN FOUR 11 FOOT LANES, TWO 11 FOOT LANES ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING CENTER MALL. Entities that perform work in the streetsfrom utilities or contractors accessing subsurface infrastructure to property owners repairing sidewalksmust follow certain procedures when undertaking such work and must meet restoration requirements following its completion. (212) 839-2399 New York, NY 10013 ALL MITIGATIONS INCLUDING: VARIABLE MESSAGE BOARDS, NYPD INTERSECTION TRAFFIC AGENTS, CONSTRUCTION, PARKING, AND BUS STOP SIGNAGE MUST IN PLACE AND MAINTAINED FOR THE LIFE OF THE PROJECT. PRIOR TO BEGINNING ANY WORK, TO ENSURE THAT YOU RESTORE IN-KIND, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. In addition to the application procedures for the four categories of permit types, there are some situations or street conditions that require special procedures. 233 Schermerhorn Street, 11th Floor The construction of any vault that extends beyond the curb must be authorized under a revocable consent agreement, as required in Section 2-13(c) of the Highway Rules, in addition to approval by PEU. Manhattan / Central Permit Office The concrete base must be restored at the same grade as the existing base; at no time may it be brought up to the asphalt course unless authorized by NYC DOT. Outlined below are the basic procedures in applying for a Sidewalk Repair Permit by mail: The New York City Tel: (212) 860-1845, Queens Atransformer vaultis a subsurface structure or room that houses electrical transformers and appurtenant equipment. The full list of Canopy Permit types is shown in the table. Download a PDF of the Lighting chapter for offline access to the content in this section. 1FTRES-RESTORE AS PER SKETCH #9 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Kew Gardens, NY 11424 Canopy (CAN) hold A CAN hold is automatically placed on a canopy maintenance permit application until a HIQA inspector performs a final inspection confirming the submitted plans. Special Notice: This edition was finalized before the state of emergency due to COVID-19; as city processes adapt in response to the crisis, they may temporarily differ from the guidance provided here. NO WORK SHALL BE PERFORMED UNDER THIS PERMIT UNLESS ACCOMPANIED BY AN ACTIVE TYPE 204 PERMIT TO MAINTAIN THE FENCE & AN ACTIVE TYPE 215 PERMIT. SIGNS SHALL BE POSTED IN ACCORDANCE WITH FEDERAL M.U.T.C.D.MANUAL. RESTORATION MUST BE FULL DEPTH CONCRETE AS PER FIRST AVE SPEC,1042A,B & 1050. Permanent RestorationUpon completion of work in a street, permittees are required to restore all street openings/excavations in accordance with the Highway Rules, Section 2-11(e) including, but not limited to, the following required restoration elements: Temporary RestorationIf street opening/excavation work remains unfinished at the end of the day, the permittee must perform temporary repairs in accordance with the Highway Rules, Section 2-11(e) including, but not limited to the following requirements: Street restoration following utility work, 18th Street and Irving Place, Manhattan. All other inquiries: (212) 748-6610 THIS STIP IS USED FOR WORK IN NUMEROUS LANES BUT NOT FOR THE ENTIRE LENGTH OF THE BLOCK. Kew Gardens, NY 11424 WALKWAY IN ROADWAY MAY BE CLOSED 8AM- 4:30PM MON - FRI OPEN ALL OTHER TIMES. MANTAIN 1 13 FOOT LANE EAST BOUND, 1 15 FOOT LANE WEST BOUND. Office hours: 8:30 AM - 4:30 PM, The Bronx SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. A list of partially and fully restricted streets where canopy placement is limited or prohibited can be found in the Highway Rules, Section 2-04(f). Tel: (646) 252-5517 or (646) 252-5544, New York State Department of Transportation (NYSDOT) 165 Cadman Plaza East Only a canopy installer or authorized agent that is registered with NYC DOT can apply for a permit to install the canopy. 66 John Street, 10th Floor CONTAINMENT ONLY TO RESRTICT PARKING AND FOR STORAGE OF EXCAVATED MATERIAL/FILL. Canopy placement must be adequate for public safety and must be suitable to the circumstances of the proposed canopy location and not interfere with the public use of the sidewalk. Due to upcoming major building rehabilitation at 1400 Williamsbridge Road. The area of the sidewalk closest to the curb, where light poles, tree pits and other vegetation, signs, fire hydrants, and street furniture are typically located, is referred to as the furnishing zone.. Permeable Interlocking Concrete Paver (PICP), Provides space for walking, the most widely used mode of travel in New York City, Creates linkages to transit and connects neighborhood destinations, Facilitates straight and unobstructed pedestrian movement, free of vehicle conflicts except at intersections and driveways, With adequate width, can provide space for staying activities such as relaxing, shopping, eating, and socializing, Coordinate streetscape/utility work to minimize street cuts, On both sides of all streets that are 22 feet wide or wider. Bronx, NY 10461 DOT is committed to making our streets and sidewalks networks accessible to all, particularly aging New Yorkers and persons with disabilities. WORK INCLUDES TREE PIT & MAY INCLUDE NEW CURB,REQUIRED ROADWAY REPLACEMENT AND SIDEWALK REPLACEMENT. Notes: 1. OF BRIDGES: UPON INITIAL INSTALLATION OF A CANOPY, THE PERMIT TO MAINTAIN A CANOPY SHALL BE PLACED ON HOLD UNTIL A FINAL INSPECTION DETERMINES CANOPY WAS INSTALLED AS PER SUBMITTED PLANS. Report a problem. the Manual on Uniform Traffic Control Devices, a publication issued by the Federal Highway Administration containing the basic principles that govern the design and use of traffic control devices for all streets, highways, bikeways, and private roads open to public travel. Tel: (718) 482-4825. NO WORK SHALL BE PERFORMED UNDER THIS PERMIT UNLESS ACCOMPANIED BY AN ACTIVE TYPE 208 & 215 PERMIT. After repairs are complete, the property owner can contact 311 to schedule a Sidewalk Violation Dismissal. Office hours: 8:30 AM-3:30 PM. Learn about ParkNYC. PRIOR TO BEGINNING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND, YOU MUST CONTACT THE NYCDOT TRAFFIC OPERATIONS DIVISION TO OBTAIN THE RESTORATION PLANS FOR THIS ROADWAY INCLUDING COLOR MARKINGS AND ANY OTHER INSTALLATION REQUIRED. If the application and its supporting documentation are accepted, the OCMC Project Manager (PM) reviews the application and all associated documents and adds the permit stipulations to the permit application. (212) 839-8857 United States Department of Transportation, Book of Standards for Highways and Incidental Structures, Construction and Traffic Standard Details, Design Standards and Specifications Drawings, PDF, DGN (freely available login required), PDF, DGN (individual division details also available). Standard Drawings are not currently available for download from the shaded states. Workers pour cement during sidewalk reconstruction. Longitudinal SlopeThe longitudinal slope of the sidewalk must be uniform and parallel to the curb at the curb's proper grade. DO NOT PLACE ON MTA/NYCT ANTENNA POLES. It provides both a thorough update to the guidance in previous iterations and a number of important additions: a new chapter on public programming in streets and public spaces; a host of new entries throughout the Process, Geometry, Furniture, and Landscape chapters; and substantially expanded coverage of several key topics, including bike lanes, inclusive design, and landscape selection and management. CANNOT WORK WHEN GOWANUS EXPRESSWAY HAS MORE THAN 1 LANE CLOSED SOUTHBOUND. Bridge (BOB) hold Any planned work requiring a Building Operations/ Construction Activity Permit that may potentially be within 100 feet of a bridge structure will be placed on a Bridge hold. Telephone inquiries: 8:30 AM-4:30 PM, Staten Island All construction-related permits have expiration dates. WORK 11 PM TO 5 AM, MONDAY TO FRIDAY, MAINTAIN TWO 11 FOOT LANES FOR TRAFFIC, RESTORE FULL WIDTH WHEN SITE IS UNATTENDED. Kew Gardens, NY 11415 A $35 filing fee is required for all vault applications. Following issuance of the Emergency Street Opening Permit Number, the permittee must submit an application for a regular Street Opening Permit within two business days (Highway Rules, Section 2-11(g)). PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE BENCH. AS A CONDITION OF THIS PERMIT A CONSTRUCTION MANAGER FAMILIAR WITH THIS PROJECT IS REQUIRED TO ATTEND WEEKLY TUESDAY MEETINGS AT 115 BROADWAY 5TH FL OF THE L.M.C.C.C. POST "NO STANDING 7AM- 6PM M-F" SIGNS ON THE NORTH CURB. "Base course" refers to the layer of material below the wearing course. WORK HOURS ARE NORTHBOUND 7 AM TO 3 PM OR SOUTHBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE NORTHBOUND 10 AM TO 4 PM OR SOUTHBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS NORTHBOUND 7 AM TO 3 PM OR SOUTHBOUND 10 AM TO 6 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE NORTHBOUND 10 AM TO 6 PM OR SOUTHBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE EASTBOUND 10 AM TO 4 PM OR WESTBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 6 PM, MONDAY THROUGH FRIDAY, THIS PERMIT IS VOID IF INSURANCE IS NOT RENEWED TO COVER PERIOD OF THIS PERMIT, WORK HOURS ARE EASTBOUND 10 AM TO 6 PM OR WESTBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, THE PERMITTEE IS REQUIRED TO INSTALL, MAINTAIN, AND REMOVE ALL NECESSARY TEMPORARY PARKING AND REGULATORY SIGNS AND PAVEMENT MARKINGS AND RESTORE TO THEIR ORIGINAL CONDITION PER NYCDOT STANDARDS PRIOR TO THE EXPIRATION OF THE PERMIT. A SEPARATE 221 PERMIT IS NOT REQUIRED FOR CAPITAL/GOVT PROJECTS. Bronx.Forestry@parks.nyc.gov Each applicant must obtain and provide Worker's Compensation insurance in accordance with the laws of the State of New York from a licensed insurance company. WORK 10AM-3PM TO SET UP WORK AREA INCLUDES SHIFTING MOVING LANE TO CENTER STRIPED AREA AND ESTABLISING WORK ZONE ONCE WORK ZONE ESTABLISHED MAY WORK 24/7 WITHIN WORK ZONE/DRILLING ALL WORK IN ACCORDANCE WITH DRAWING MPT-3 8/28/07. Pedestrian RampsWhen a corner is constructed, reconstructed or repaired, pedestrian ramps must be installed in accordance with NYC DOT Standard Highway Specifications found and in accordance with the most recent revision of Drawing H-1011 from the NYC DOT's Standard Details of Construction. DOT's preference is that there is no split in Pedestrian Flow. THIS WORK HAS PRIORITY OVER OTHER NON-EMERGENCY WORK ON STREET SEGMENT. "Backfill" refers to the bottom layer of the restoration. CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT. RED LIGHT CAMERA CONDUIT IS LOCATED IN YOUR PROPOSED WORK AREA. Revenue hold If the permittee owes NYC DOT money for an open Corrective Action Request (CAR) or Jolt Elimination Team (JET) bill, all future permit requests may be placed on hold until the bills are paid. Policies; Accessibility; About CT; THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR ORIGIN TO DESTINATION FOR DISTANCE OF TRENCH CURB TO CURB AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF A LIMITED-ACCESS ARTERIAL HIGHWAY, WRITTEN APPROVAL FROM THE NYCDOT OCMC- HIGHWAYS IS REQUIRED.WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF A PUBLIC. Existing InfrastructurePermittees must not remove parking meters, traffic signs, street lights, street furniture, and similar items unless authorized on the permit. SECTION 6: LEGAL ENTITY PERSONNEL: OFFICERS/ DIRECTORS/ MANAGING AGENTS/ OWNER/ PARTNERS /MEMBERS /INDIVIDUALS, ETC. New York State Code of Rules and Regulations, Laws of New York(use this webpage to search for the below laws), Administrative Code of the City of New York, Zoning Resolution of the City of New York, American Association of State Highway and Transportation Officials (AASHTO), Institute of Transportation Engineers (ITE), National Association of City Transportation Officials (NACTO), NYC Department of Design and Construction, NYC Department of Environmental Protection, NYC Mayor's Office for People with Disabilities, NYS Department of Environmental Conservation, Downtown Brooklyn Traffic Calming Study (NYC DOT: 2004), Project Development & Design Guide (Massachusetts Highway Department: 2006) [PDF], San Francisco Better Streets PlanDraft for Public Review (City and County of San Francisco: June 2008), Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities (New Jersey DOT/Pennsylvania DOT: 2008) [PDF], Parks, Plants, and People: Beautifying the Urban Landscape (Lynden B. Miller: 2009), Trees in the Urban Landscape: Site Assessment, Design, and Installation (Nina L. Bassuk and Peter J. Trowbridge: 2004), Permeable Interlocking Concrete Paver (PICP), Manual on Uniform Traffic Control Devices (MUTCD), National Historic Preservation Act, Section 106, New York State Department of Environmental Conservation (Title 6), New York State Environmental Quality Review Act (SEQR), New York State Historic Preservation Act, Section 14.09, New York State Department of Transportation (Title 17), A Policy on Geometric Design of Highways and Streets, 7th edition, A Guide for Achieving Flexibility in Highway Design, Guide for the Planning, Design, and Operation of Pedestrian Facilities, Guide for the Development of Bicycle Facilities, 4th edition, BIKESAFE: Bicycle Countermeasure Selection System, PEDSAFE: Pedestrian Safety Guide and Countermeasure Selection System, Designing Sidewalks and Trails for Access, Public Involvement Techniques for Transportation DecisionMaking, MUTCD (Manual on Uniform Traffic Control Devices), Roadside Best Management Practices that Benefit Pollinators, Designing Walkable Urban Thoroughfares: A Context Sensitive Approach, The Design and Safety of Pedestrian Facilities, Accessible Public RightsofWay: Planning and Designing for Alterations, The Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities, National Menu of Best Management Practices (BMPs) for Stormwater Management, Active Design Guidelines: Promoting Physical Activity and Health in Design, High Performance Infrastructure Guidelines: Best Practices for the Public RightofWay, Standards for Green Infrastructure (DEP: 2017), ProcedureGoverning Limited Survey for Green Infrastructure, Procedure Governing Limited Geotechnical Investigation for Right-of-Way Green Infrastructure Practices, PlaNYC Sustainable Stormwater Management Plan, Specifications for Traffic Signals and Intelligent Transportation Systems Construction and Equipment, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Select Bus Service Design Guidelines: Update, El-Space Toolkit: Strategies for Reclaiming Sites Beneath Elevated Transportation Infrastructure, Version 1.0, Park Design for the 21st Century: High Performance Landscape Guidelines, Native Planting Species Guide for New York City, Inclusive Design Guidelines: New York City, New York State Stormwater Management Design Manual, San Francisco Better Streets PlanDraft for Public Review, Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities, New York State Environmental Conservation Law (ECL), New York State Vehicle and Traffic Law (VTL), Department of Citywide Administrative Services (Chapter 35), Department of Consumer Affairs (Chapter 64), Department of Design and Construction (Chapter 55), Department of Environmental Protection (Chapter 57), Department of Parks and Recreation (Chapter 21), Department of Small Business Services (Chapter 56), Department of Transportation (Chapter 71), Franchises, Revocable Consents, and Concessions (Chapter 14), Landmarks Preservation Commission (Chapter 74), Public Design Commission/Art Commission (Chapter 37), Contracts, Purchases and Franchises (Title 6), Environmental Protection and Utilities (Title 24), Department of Citywide Administrative Services (Title 55), Department of Environmental Protection (Title 15), Rules Governing the Construction of Private Sewers, Rules Governing the Use of the Water Supply, Department of Parks and Recreation (Title 56), Department of Small Business Services (Title 66), Franchise and Concession Review Committee (Title 12), Landmarks Preservation Commission (Title 63), Public Design Commission/Art Commission (Title 57), Rules of the City of New York (Title 43 and 62), U.S. Traffic Calming Manual (American Planning Association & American Society of Civil Engineers: 2009), Under the Elevated: Reclaiming Space, Connecting Communities (DOT and Design Trust for Public Space: 2015). State Standard Drawings | FHWA - Transportation Canopy permits are generally taken out by building owners, business owners, and canopy installers. The latest edition is available for purchase for $50 from the Office of the Agency Chief Contracting Officer, 55 Water Street, Ground Level, New York, NY, 10041. BLNRES-RESTORE AS PER SKETCH #5 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. General Guidelines | NYC Street Design Manual OCCUPY TWO 11 FOOT LANES 12:01 AM TO 5 AM NIGHTLY. MUST TINT CONCRETE TO MATCH ASPHALT. As shown in the screen image, the pop-up for the "NYC DOT 10 year Capital Plan" layer features a project ID, title, and the fiscal year for which the project is planned, whereas the pop-up for "NYC DOT Protected Streets" includes street name and the date to which protected status extends. Several forums are in place to provide advance notice of city capital projects. Staten Island, NY 10301 This category of permits applies to any repairs, replacements or new sidewalk installations. USE OF METERED,AUTHORIZED PARKING AND NO STANDING ZONES IS PROHIBITED. New York City Department of Transportation This chapter describes the different types of permits that are issued by the New York City Department of Transportation (NYC DOT), the one-time permittee registration process, the application procedure for each permit type, and special circumstances and procedures. 80-30 Park Lane Queens Under the surface, the same streets support the city's water, sewer, power and telecommunications infrastructure, as well as its subway tunnels and building vaults. Typically, a valid permit issued by the New York City Department of Buildings (DOB) is required prior to application for permits in this category. Outlined below are the basic application procedures for Building Operations/Construction Activity Permits. FULL BLOCK SEGMENT RESTORATION IS REQUIRED FOR THE LENGTH OF THE ROADWAY CURB TO CURB. **DOT's lighting division generally classifies cross streets as local roadways*DOT's lighting division generally classifies avenues and boulevards as collector roadways. Included are topics about Policy, Procedures, Specifications and Design Standards (Manuals, Guidelines, and Computer Aided Design and Drafting drawings). LOCAL AND EMERGENCY ACCESS MUST BE PROVIDED FROM EACH END OF THE BLOCK AT THE INTERSECTIONS WITH USE OF FLAGGERS AND SIGNAGE. Applicants have two options to acquire an EAN. OR PUBLIC PARK WRITTEN APPROVAL FROM CITY OF NEW YORK PARKS AND RECREATION IS REQUIRED. REQUIRES LOWER MANHATTAN BOROUGH COMMISSIONER'S OFFICE (LMBCO) REVIEW. Based on the documents submitted, HIQA makes a preliminary determination as to whether the proposed location may be suitable for a canopy. Further information on permits is available in Chapter 3 Permits and Approvals. The Bronx THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR RESTORATION OF CUT CONFINED TO WITHIN 8 FEET OF THE CURB LINE IN ACCORDANCE WITH NYCDOT RULES AND REGULATIONS FOR PROTECTED STREETS. ONE 11-FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY, ON WEEKENDS, DEFINED AS 12:01AM SATURDAY THROUGH 6AM MONDAY. THIS STIP IS USED FOR MULTIPLE CUTS IN A CURB/PARKING LANE AND FOR SINGLE CUTS IN CURB LANES THAT CONVERT TO TRAVEL LANES DURING SPECIFIC HOURS. The applicant must satisfy all of the requirements listed in section 2-02(a) (3) of the. A collection of manuals, specifications, and other publications relevant to the Office of Traffic Operations. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE OPERATION OF THE STATION. A copy of the form can also be foundin Appendix B, Forms. NOTARIZE THE FORM. Interpreting Parking or Traffic Sign or Regulation Locate Parking Signs on Specific Streets Parking Sign Fact Sheet Parking in a School Zone Parking Rules School Bus Parking To request authorization for the installation of a canopy, an applicant must initiate the process at the HIQA office in the borough where the proposed canopy will be located. Office hours: 8:30 AM-4:30 PM, Staten Island Listed in the table are the most commonly requested Building Operations/Construction Activity Permit types, which may be used when completing an application. Whenever a permit has been issued in error and the conditions are such that the permit should not have been issued. 211th Street and 23rd Avenue, Queens Riverside Drive, Manhattan Benefits Enhances pedestrian safety and accessibility by reducing crossing distances and providing refuge for pedestrians to cross road in stages Calms traffic, especially left turns and through-movements, by narrowing roadway at intersection NYC ADMINISTRATIVE CODE, 19-142, WORKERS ON EXCAVATIONS: A PERSON TO WHOM A PERMIT MAY BE ISSUED, TO USE OR OPEN A STREET, SHALL BE REQUIRED, BEFORE SUCH PERMIT MAY BE ISSUED, TO AGREE THAT NONE BUT COMPETENT WORKERS, SKILLED IN THE WORK REQUIRED OF THEM, SHALL BE EMPLOYED THEREON, (CONT. In order to maintain world-class streets, permits must be obtained for the work performed in the street. TO FRI. MOBILAZATION OF PROJECT INCLUDING RE-STRIPPING OF ROADWAY AND INSTALLATION OF BARRIERS WORK ONLY 10PM TO 6AM MON TO FRI AND 10PM TO 8AM SAT AND SUNDAY. However the permit window remains open until 3:15 PM to pick up permits. 42 Broadway NO WORK SHALL BE PERFORMED UNDER THIS PERMIT UNLESS ACCOMPANIED BY AN ACTIVE VAULT PERMIT AT THE SAME LOCATION (EITHER PERMIT TYPE 117,107 OR 106). USE OF NO STOPPING ZONES, NO STANDING ZONES AUTHORIZED PARKING, DIPLOMAT PARKING AND TAXI ZONES IS PROHIBITED. New York, NY 10007 One call to New York 811 provides for where gas (yellow), electric (red) and phone (orange) are located. 8FTRES-RESTORE AS PER SKETCH #1 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. For New York City Department of Design and Construction (DDC) capital projects, a CPO hold can only be released by DDC. Note: All distances indicate measurements from nearest edge of any object to closest edge of vault. Street Opening, Building Operations/Construction Activity, Sidewalk Construction, and Canopy Permits are reviewed and stipulated by OCMC staff. Staten Island, NY 10301 If repairs have not been made within the 75 day period, the City may make the repairs and bill the property owner for the cost of the repairs. PRIOR TO BEGINING ANY WORK, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. DESIGNATED AS COBBLESTONE STREET. Long Island City, NY 11101 619 Work Zone Traffic Control - New York State Department Of Transportation It also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. Moreover, the Third Edition is available onlineto increase the reach and accessibility of this essential reference document. The suspension does not apply to emergency authorizations and permits (see Section 3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings). WORK 8 AM TO 7 PM MONDAY TO FRIDAY. An Occupancy of Sidewalk Permit is required when either more than 3 feet from the property line is obstructed by a fence or a minimum of 5 feet of clear path cannot be maintained for pedestrians, or as otherwise stipulated. The NYC DOT Bureau of Permit Management and Construction Control (the Bureau) is responsible for overseeing all construction-related permitting. NO NOISY OPERATIONS MAY OCCUR AFTER 10:00 PM. Office hours: 8:30 AM-3:30 PM (in person) HIQA will determine whether an inspection of the work site is warranted to establish existing conditions before work begins. From a block party, which opens a single block to community activities for a day, to Summer Streets, which dedicates over 7 miles of streets to pedestrians, runners, and cyclists, programming reminds New Yorkers that streets are public space, and should support active, healthy, and sustainable lifestyles. Standard Sheets (US Customary) > Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) US Customary Standard Sheets Standard Sheets are available both in the US Customary units accessible below and in Metric units. Following are the specific steps for canopy authorizations and permits: A permit must be obtained to install the canopy at the approved location (Erect Canopy Permit from the "01" Street Opening Permit series). MAY BE INTERMITTENTLY CLOSED TO THROUGH TRAFFIC WITH THE USE OF FLAGGERS WHILE PROVIDING LOCAL ACCESS AT ALL TIMES FOR A MAXIMUM OF 90 MINS. ISSUED. Manhattan check-in window hours extended to 3:30pm for Bronx work only. The hold is to review the proposed work and set conditions for the work and/or restoration. (212) 839-2387/88/89 FULL WIDTH OF SIDEWALK SHALL BE OPENED TO PEDESTRIANS WHEN SITE IS UNATTENDED EXCEPT FOR CONCRETE CURING WHEN THAT PORTION OF THE SIDEWALK MAY REMAIN CLOSED PROVIDED ALL OTHER STIPULATIONS ON THIS PERMIT ARE COMPLIED WITH. Registration applications should be printed on 8 1/2"x 14" paper. THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION & WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS. It also helps NYC DOT to identify opportunities for joint bidding and to coordinate the timing of the agency's resurfacing and reconstruction activities. FULL TRAVEL LANE RESTORATION WOULD BE REQUIRED FOR 11' WIDTH OF TRAVEL LANE AND THE LENGTH OF THE WORK PLUS ANY LL14 CUTBACKS. Exceptions include, Ribbon sidewalks are appropriate in R1-R6 zoning districts; full sidewalks are used elsewhere, Sidewalks should be as wide as possible appropriate to foot traffic and available street width, Sidewalks should always be provided on both sides of the street, A parks internal path located near a roadway does not substitute for a sidewalk, If the sidewalk is more than 25 feet wide, there should be a clear path adjacent to the building line and an 8-foot clear path adjacent to the curbside furnishing zone. THE EMBARGO INCLUDES BUILDING OPERATIONS. Applicants should contact the NYC DOT Plan Examination Unit (PEU) of the Permit Office to initiate the application process and to determine specific requirements for a permit and a license, if required. EmbargoesNYC DOT imposes construction "embargoes" (a temporary suspension of active permits in the affected area) for significant special events including the New York City Marathon, parades, high profile projects and the winter holiday season. Brooklyn, NY 11201 Listed on the following page are the most commonly requested Street Opening Permit types which may be used when completing an application. The Office of Permit Management (Permit Office) provides extensive customer support for all applicants, registers permittees, receives and reviews for accuracy and completeness permit application submitted in person,and also reviews appropriate fees for both online and in-person applications.